These calculators put dates on deadlines people act on, so a wrong one matters. When a calculator gave a wrong answer, the fix is listed here with what it did before and what it does now. Guides that were corrected are listed too, and so are new guides. We find most of these by reading each tool's code against the rule it claims to follow and re-running its worked examples. If you find one we missed, the contact page says what to send, and the methodology page explains how the checking works.

October 13, 2026: 14 calculator corrections

The 12 October review ended with a list of known limitations we had not yet fixed. These are the fixes, each checked against the statute, regulator guidance or holiday list it depends on.

CalculatorWhat was wrongWhat it does now
Support Ticket Response Deadline Had no holiday calendar and no 24x7 option. A P1 ticket opened Fri 15 Jan 2027 at 15:10 (desk 08:00–18:00) got a resolution target of Mon 18 Jan 09:10, which is Martin Luther King Jr. Day. Takes a holiday calendar and custom closure dates, and lists the closures it skipped: the same ticket with the US calendar is due Tue 19 Jan 09:10. A 24×7 option turns both targets into elapsed hours (Fri 15 Jan 19:10).
SLA Response / Resolution Deadline Had no holiday calendar and no 24x7 option. 16 business hours from Fri 15 Jan 2027 15:10 (08:00–18:00) gave Tue 19 Jan 11:10, burning ten hours on MLK Day. Skips the selected country's public holidays and any custom closures: Wed 20 Jan 11:10 with the US calendar. A 24×7 option gives plain elapsed time.
Payroll Pay Period Generator Used the federal (OPM) holiday list, so a Friday payday before a Saturday holiday moved back a day although banks are open: Fri 3 Jul 2026 became Thu 2 Jul. Uses the Federal Reserve's holiday schedule for the US, as the ACH tool does. Fri 3 Jul 2026 stays a payday; Sunday holidays still close the Fed the Monday after. State holidays no longer move paydays.
Net 30 Invoice Due Date Moved the due date off a weekend or holiday but left the early-payment discount date on the raw day: invoice 25 Nov 2026 with 2/10 showed the discount ending Sat 5 Dec next to a due date of Mon 28 Dec. Moves both, as N.Y. Gen. Constr. Law § 25 does for payment due on or within a period ending on a weekend or holiday: discount until Mon 7 Dec, due Mon 28 Dec, each showing the day it moved from. Unticking the box keeps both raw dates.
Payment Terms Calculator (2/10 Net 30) Had no calendar and never moved either date: 2/10 Net 30 from 25 Nov 2026 showed the discount ending Sat 5 Dec and net due Fri 25 Dec (Christmas Day). Takes a workweek and holiday calendar and moves both dates to the next business day by default: discount until Mon 7 Dec, net due Mon 28 Dec. Untick to keep raw dates. The 37.2% annualised cost is still computed on the stated terms.
Freelance Invoice Scheduler Pure calendar arithmetic: from 26 Oct 2026 every 30 days on Net 30, invoice 3 was issued on Christmas Day, invoice 4 on Sunday 24 Jan 2027, and invoice 2 fell due on Christmas Day. Takes a holiday calendar. By default an invoice scheduled for a weekend or holiday goes out the next business day (invoice 3 on Mon 28 Dec, invoice 4 on Mon 25 Jan) and a due date on one moves to the next business day (invoice 2 due Mon 28 Dec). Later invoices stay anchored to the start date. Both options can be switched off, and every moved date is listed.
Purchase Order Lead-Time Counted the transit leg on the supplier's holiday calendar in business days, so an ocean or air leg, or a leg in the buyer's country, could not be entered. The page example also said a PO released 1 Jun 2026 (10 + 5 business days, US) is receipted Mon 22 Jun; the tool gave Tue 23 Jun because of Juneteenth. Transit can run in business days on the supplier's calendar (the default, unchanged results), in business days on a receiving country's calendar, or in calendar days with receipt on the next receiving working day: ready Fri 11 Dec 2026 plus 14 calendar days arrives Christmas Day and is receipted Mon 28 Dec. The page example now says Tue 23 Jun, 22 calendar days.
Customs Demurrage Penalty Tracker In calendar-day mode it rolled a last free day that fell on a weekend or holiday to the next working day, which only some tariffs do: four calendar free days from Tue 22 Dec 2026 gave Mon 28 Dec. Counts calendar free time straight through, as a calendar-day tariff does, and warns when the last free day falls on a non-working day: Sat 26 Dec. A box applies the extension for tariffs that grant it (Mon 28 Dec). Working-day mode is unchanged.
Mechanic’s Lien Filing Deadline Approximated Texas as 120 days and New York as 240 days (and Illinois's four months as 120 days), took only 'last labor/materials' for every state, had no notice-of-completion input and never moved a deadline off a weekend. From 1 Jun 2026: TX Tue 29 Sep 2026, NY Wed 27 Jan 2027 for every project, CA Sun 30 Aug 2026. Applies each statute's own trigger and unit: TX the 15th day of the 4th month after the month the original contract was completed (3rd month for residential): Thu 15 Oct 2026; NY 8 months (Mon 1 Feb 2027), or 4 for a single-family dwelling (Thu 1 Oct 2026); IL 4 months. California takes the recorded notice of completion or cessation (60 days for a direct contractor, 30 for others). A deadline on a weekend or holiday moves under each state's computation statute: CA Mon 31 Aug.
NZ Court Filing Deadline Excluded the provincial anniversary day from every working-day count. That is the Senior Courts Act 2016 s 4 definition; the High Court Rules r 1.3 and District Court Rules r 1.4 definitions, which set most filing periods, do not exclude it. It also never moved a deadline off a court holiday that is not a public holiday. Asks where the period comes from. Under the Rules the anniversary day is counted, but a deadline landing on it or another court holiday (24 Dec or Easter Tuesday in the High Court) moves to the next day the registry is open (HCR r 1.18, DCR r 1.22). 30 working days from 1 Dec 2026 with Auckland selected: Thu 4 Feb 2027 before, Wed 3 Feb now (Thu 4 Feb under the Act).
GDPR / DSAR Response Deadline Never moved a deadline off a weekend or public holiday, though the EDPB (Guidelines 01/2022, para 161) and the ICO both say it moves to the next working day: a request received Sat 31 Jan 2026 showed Sat 28 Feb. Takes a holiday calendar (UK by default) and moves the one-month and extended deadlines to the next working day: Mon 2 Mar 2026. The extension stays three months from receipt, as the ICO directs (31 Jan gives 30 Apr), and the page says the EDPB has not set a method.
FCRA Adverse Action Waiting Period Reported the fifth business day itself as 'final adverse on or after', which cuts the last day of the candidate's five days: notice sent Wed 20 May 2026 gave Thu 28 May. Shows the waiting period running through Thu 28 May and the earliest final adverse action on the next business day, Fri 29 May, the reading fair-chance laws use ('at least five business days').
NZ / AU Business Day Calculator The page's FAQ said Australian Labour Day falls in four different months. Three: March, May or October, as the calculator's holiday data has it.
NZ Filing Same-Day Cutoff Its New Zealand-time default was patched in by searching the page for a data-tz attribute. The zone is declared in the calculator's own settings and applied when the form refreshes, with no change to results.

Holiday data, same day

Guides corrected, same day

Every published guide that described one of these calculators was re-run and corrected, and shows an “Updated” date of 13 October. What each one said before, and says now:

October 12, 2026: 36 calculator corrections

Writing guides that chain several calculators together means running each one against its own page and its older guides side by side. That turned up these.

CalculatorWhat was wrongWhat it does now
Mechanic’s Lien Filing Deadline California's 20-day preliminary notice and Florida's 45-day notice to owner were counted from the date entered, the LAST day of labour or materials. A last day of 1 Jun 2026 showed 'notice by Jun 21'. Both notices run from the FIRST day you furnish work (Cal. Civ. Code 8204; Fla. Stat. 713.06). For California and Florida the tool states the rule (within 20 or 45 days of your first day on the job) instead of inventing a date from the last one. The lien filing deadline is unchanged.
Subscription Renewal Date The August fix made renewals fall on the calendar date by default, but the 'roll to a working day' box still rendered ticked, so a 1 Jan 2026 annual plan showed Mon 4 Jan 2027. The box starts unticked: the renewal is Fri 1 Jan 2027, as card billing does it. Tick it for invoiced terms.
Real Estate Closing Date The August fix made calendar days the default, but the 'Use business days' box still rendered ticked, so a default 30-day close was counted as 30 business days (about six weeks). The box starts unticked. Accepted 1 Jun 2026, the default close is Wed 1 Jul 2026 (Wed 15 Jul with business days ticked).
Discovery / Court Filing Deadline With the mail rule on, the three FRCP 6(d) days were added to the raw day-30 date and the result rolled only once, so a weekend ending made the deadline a day early: 30 days from Fri 22 Jan 2027 by mail gave Wed 24 Feb 2027 (and Wed 3 Jun 2026 from Fri 1 May 2026). It also defaulted to business days and a 10-day period, though FRCP periods count calendar days and discovery responses are 30 days. Rolls the period off any weekend or holiday first, then adds 3 calendar days, then rolls again: Thu 25 Feb 2027 (Thu 4 Jun 2026). Defaults to 30 calendar days. The mail-rule label and page copy say e-service gets no extra days.
Service of Process Deadline It defaulted to 21 business days, though the FRCP 12 answer period is 21 calendar days. It added the mail days before the weekend roll instead of after, and it offered 'Electronic service (+3 days)' as a plain option, though federal e-service lost the 3 days in 2016. The page example said service by mail on 1 Jun 2026 was due Fri 3 Jul 2026, but the tool gave Mon 6 Jul. Defaults to calendar days. Federal mail service rolls the period, then adds 3 days, then rolls again. The electronic, out-of-state mail and publication options are labelled as state-court rules. Mail service on 1 Jun 2026 with 21 days now gives Thu 25 Jun 2026; with business days ticked it gives Mon 6 Jul, and the page example now says both.
Court Date Calculator The response period defaulted to business days although the page cites FRCP 6, which counts calendar days. A 30-day response from 1 Jun 2026 projected a hearing on Mon 5 Apr 2027. Defaults to calendar days: response due Wed 1 Jul 2026, projected hearing Wed 30 Dec 2026. The page example and FAQ now give these figures (about seven months, or about ten in court days).
Right of Rescission (3-Business-Day) It used the federal observed holiday dates. When a fixed-date holiday falls on a Saturday, it treated the Friday as a holiday and the Saturday as a business day, the reverse of Reg Z. Closing on 30 Jun 2026 gave Sat 4 Jul 2026. Its limits text also said same-creditor refinances are 'generally not rescindable'. Uses the actual 5 USC 6103(a) dates (Jan 1, Jun 19, Jul 4, Nov 11, Dec 25). A Friday observed for a Saturday holiday counts as a business day and the Saturday does not, giving Fri 3 Jul 2026. A Monday observed for a Sunday holiday is still treated as a holiday, which can only make the deadline later, and the limits text says so. The limits text now says a same-creditor refinance is rescindable to the extent of new money (1026.23(f)(2)).
NZ Court Filing Deadline Working-day counts skipped only public holidays. NZ court working days also exclude 25 Dec to 15 Jan, so 30 working days from 1 Dec 2026 gave Mon 18 Jan 2027, and 5 working days from 20 Dec 2026 landed on Tue 29 Dec. Working-day mode now skips every day from 25 December to 15 January. It also skips the anniversary day of the selected region, which the definition does exclude ('the day observed as the anniversary day of the province in which the court is located'). 30 working days from 1 Dec 2026 now gives Wed 3 Feb 2027 with Canterbury selected. Calendar-day mode is unchanged.
Final Paycheck Deadline (US) Any state outside CA/NY/TX/FL/WA silently got New York's next-payday rule (+14 days). A Massachusetts discharge on 15 Jul 2026 showed Wed 29 Jul, though the law requires payment on the day of discharge. Florida was shown a 'state rule' although it has no final-pay statute. A California employee who quit with 72 hours' notice was always given +3 days. Uncovered states return 'No verified rule for <state>' with no date and list the covered states (CA, NY, TX, WA, FL). Florida returns 'Florida has no final-paycheck statute'. A new option, 'Quit with 72+ hours' notice (CA)', gives the last day worked (Lab. Code 202). The state picker ticks the covered states.
Statute of Limitations Deadline Florida personal injury used 4 years, though since HB 837 (24 Mar 2023) negligence is 2 years. An incident on 13 Oct 2026 gave Sun 13 Oct 2030. Florida PI is 2 years (Fla. Stat. 95.11(5)(a)), giving Fri 13 Oct 2028. Incidents on or before 24 Mar 2023 keep 4 years, and an explanatory note is shown.
Tax Filing Deadline Extender It ignored DC Emancipation Day, which IRC 7503 treats as a legal holiday. 15 Apr 2028 gave Mon 17 Apr 2028 and 15 Apr 2023 gave Mon 17 Apr 2023, a day earlier than the IRS deadline. The page example also gave the 2023 extension date as 17 Oct; the tool's date was 16 Oct. Treats 16 April as a holiday, or Fri 15 Apr when the 16th is a Saturday and Mon 17 Apr when it is a Sunday, inside this tool only. 15 Apr 2028 now gives Tue 18 Apr 2028. The past IRS deadlines are reproduced: 2017 Tue 18 Apr, 2018 Tue 17 Apr, 2022 Mon 18 Apr, 2023 Tue 18 Apr. 2027 is unchanged (Thu 15 Apr). The page copy is updated.
HIPAA Breach Notification Deadline The HHS report for a small breach (<500) was hard-coded to 28 February of the next year. Due 60 days after 31 December: 1 March 2027, or 29 February 2028 in a leap year. The page copy is updated.
FMLA Leave Return-to-Work 'Leave workdays used' counted only Monday to Friday. 12 workweeks on Sun-Thu showed 48, and on Mon-Sat 60. Counts every day of the chosen workweek: Sun-Thu 60, Mon-Sat 72, Mon-Fri 60.
Bid / Tender / RFP Deadline The question deadline was fixed at 7 business days before opening. With the default 10-day lead it fell after the submission deadline: for an opening on 11 Nov 2026, questions Nov 2 and submission Oct 28. The question deadline is now 5 business days before the submission deadline (Oct 21, 2026), and its label and page copy say so.
Board Meeting Notice Period No notice unit was selected, so the form defaulted to Weeks: 10 weeks' notice out of the box, giving notice by 2 Sep 2026 for an 11 Nov 2026 meeting. 'Clear days before meeting' also counted the meeting day. Defaults to calendar days through cfg.defaults.noticeUnit, giving notice by 1 Nov 2026. notice-period and nz-notice-period still default to Weeks. Clear days now exclude both the notice day and the meeting day: 21 days before 30 Jun 2026 gives 9 Jun with 20 clear days. The FAQ explains how to enter a clear-days rule.
NZ Filing Same-Day Cutoff 'Submitted at' defaulted to the viewer's own clock and was compared with the NZ cut-off without conversion. The label did not say NZ time. The field is labelled 'Submitted at (New Zealand time)'. It defaults to the current Pacific/Auckland time through Intl, both at build time and on the client refresh, and the result shows 'Submitted (NZ time)'. The page copy and an FAQ explain how overseas filers convert their time. The limits text notes that the court summer exclusion is not applied here.
Contract End Date Calculator The 'Notice period (days)' field counts business days but did not say so, and the limits text claimed the tool does not model notice windows. The field is relabelled 'Notice period (business days)'. The limits text now says the notice deadline is counted back in business days and that calendar-day clauses must be converted. The page copy already said business days.
Support Ticket Response Deadline The tool consults no public-holiday calendar, and the page did not say so. Added a limits line, an intro sentence and an FAQ saying holidays are counted as normal working days and must be adjusted by hand. No holiday support was added.
SLA Response / Resolution Deadline The limits text implied a holiday calendar comes into play, but the tool consults none. Added a limits line saying no holiday calendar is used. The page FAQ already said so.
I-9 Form 3-Business-Day Deadline The page FAQ said I-9 business days exclude federal holidays, but 8 CFR 274a.2(b)(1)(ii) only says 'three business days' and does not define them. The FAQ, intro, example and limits now say the tool skips federal holidays by default and that a business open on the holiday should clear the holiday calendar and use the earlier date: start Wed 1 Jul 2026 gives Tue 7 Jul by default, or Mon 6 Jul with the calendar cleared.
ACH Settlement Date Calculator The calculator treated the Friday before a Saturday holiday as a non-banking day, but the Federal Reserve is open that Friday. A next-day file on Thu 2 Jul 2026 showed Mon 6 Jul. A file sent on a holiday was also counted from that day, so a standard file on Veterans Day (Wed 11 Nov 2026) showed Fri 13 Nov. Uses the Fed holiday schedule (a Saturday holiday is not observed; a Sunday holiday is observed on the Monday). A file sent on a weekend or holiday is processed on the next banking day. Thu 2 Jul 2026 next-day now settles Fri 3 Jul 2026, and 11 Nov 2026 standard now settles Mon 16 Nov 2026. A new 'Processed on' stat shows the processing day.
T+1 / T+2 Trade Settlement Settlement was counted on the NYSE calendar alone, so trades settled on Columbus Day and Veterans Day, when banks are closed and there is no settlement. A Fri 9 Oct 2026 T+1 trade showed Mon 12 Oct. Trade dates still follow the NYSE calendar. Settlement now skips both NYSE holidays and Fed bank holidays. Fri 9 Oct 2026 settles Tue 13 Oct, and a trade done on Columbus Day (Mon 12 Oct) also settles Tue 13 Oct, together with Friday's trades, as in FINRA's schedules. Tue 10 Nov 2026 settles Thu 12 Nov. An order entered on a day the market is closed is treated as traded on the next trading day.
Payroll Pay Period Generator Each monthly pay date was built from the previous, already-clamped date, so a schedule anchored on the 30th fell back to the 27th and 28th after February and stayed there. Starting Fri 30 Jan 2026 gave Feb 27, Mar 27, Apr 28, May 28, Jun 26. Every period is now anchored to the start date's day of the month, clamped to the month's length and then rolled back off weekends and holidays: Jan 30, Feb 27, Mar 30, Apr 30, May 29, Jun 30 2026. A new stat lists the pay dates that were moved off a weekend or holiday, e.g. 'Feb 28 → Feb 27 (weekend); May 30 → May 29 (weekend)'.
Loan / Mortgage Payment Projector The form showed an 'Interval (days)' box that the calculation never read, so changing it did nothing. The box has been removed. The projector uses a monthly schedule, as its page copy already says.
Medicare Initial Enrollment Period Calculator 'Coverage starts' always showed the first day of the 65th-birthday month, even for someone born on the 1st. It also left out the rule for enrolling in or after the birthday month. Shows the actual date. Born 1 Jun 1961: 'May 1, 2026 if you enroll by April 2026'. Born 15 Jun: 'Jun 1, 2026 if you enroll by May 2026'. A second line says that enrolling from the birthday month to the end of the enrollment period starts coverage on the first of the following month.
IRS Tax Refund Date Estimator With the EITC/ACTC (PATH Act) box ticked, the estimate was Feb 15 to Feb 22. The IRS expects most of these refunds by about the first week of March. Feb 15 2026 was also a Sunday, and Mon 16 Feb was Presidents Day. The window now opens on the first IRS business day on or after Feb 15 and runs to the first Monday of March for direct deposit: Feb 17 to Mar 2, 2026. For paper checks it runs about two weeks later, but only when the PATH hold is the later constraint. The PATH stat now gives the IRS wording.
Passport Renewal Timing Calculator Routine processing was labelled and modelled as about 6–8 weeks, and mailing time was ignored. The State Department now quotes 4–6 weeks routine and 2–3 weeks expedited, plus up to 2 weeks of mail each way. Labels now read 'Routine (~4–6 weeks + mailing)' and 'Expedited (~2–3 weeks + mailing)'. The model takes the top of each range plus 2 weeks of mail in each direction. It shows when processing is done and when the passport is in hand, and keeps a further 2-week margin for the apply-by date, which is now 12 weeks before departure for routine (previously 10) and 9 weeks for expedited. For a 1 Dec 2026 trip, run on 13 Oct 2026, routine was 'ready Dec 8' and is now 'in hand Dec 22', and apply-by moved from Sep 22 to Sep 8.
FSA Grace Period & Run-Out Deadline The grace period end was calculated as plan-year end + 2 months + 15 days, which comes out a day early for plan years ending on the 30th: 30 Jun gave 14 Sep and 30 Nov gave 14 Feb. The grace period now ends on the 15th day of the third calendar month after the plan year ends: 30 Jun 2026 → 15 Sep 2026, 30 Nov 2026 → 15 Feb 2027, 31 Dec → 15 Mar (unchanged), 28 Feb → 15 May.
School Term Business Day Counter The 'Include start date' and 'Include end date' checkboxes did nothing. An unticked endpoint is now left out of the term total and of the elapsed and remaining counts.
NZ / AU Business Day Calculator The tool ignored the region selects, custom closures and include-start/end boxes that the form shows, and always counted both endpoints against the national calendars only. The NZ region (anniversary day) and AU state selections are now applied. Custom closures apply to both countries, and the endpoint boxes are honoured. Both NZ and AU are preselected so that both region selects appear, and each count is labelled with its region or as 'national holidays only'. Selecting other countries has no effect, because the tool always compares NZ with AU. Example: 1 Jan to 31 Mar 2026 with Wellington and Victoria selected was 61 NZ vs 62 AU and is now 60 vs 61. 24 Dec 2025 to 9 Jan 2026 with custom 2026-01-05 and includeStart:false was 9 vs 10 and is now 7 vs 8.
Divorce / Marriage Waiting Period The state picker did not mark which states have verified waiting periods, so 45 uncovered states looked selectable until the result refused to compute. The picker now shows ✓ for CA, TX, NY, FL, NV and IL and '— no data' for the rest, as the other state-table tools do. CA remains the default.
Construction Shutdown Calculator The stat 'Working days before shutdown' actually held the working days in the whole range with the shutdown ignored (52 in the companion post's example). Readers could mistake it for the 15 working days before the shutdown starts. It is relabelled 'Working days in range, ignoring the shutdown' (52). New stats show 'Working days before the shutdown starts' (15) and 'Working days after the shutdown ends' (24).
Timezone Working Hours Overlap The overlap was scanned in whole UTC hours, so half-hour zones came out wrong. London vs Kolkata on 20 Oct 2026 showed 4 hours, with Kolkata 13:30–17:30, past the 17:00 finish. An overlap split into two blocks was shown as one range from the first hour to the last. The scan now runs in 15-minute steps. London vs Kolkata shows 3.5 hours (09:00–12:30 London, 13:30–17:00 Kolkata). Separate blocks are listed individually, e.g. '06:00 – 10:00 and 18:00 – 22:00'. The meeting suggestion is taken from the longest block.
Holiday Bridge-Day Finder The region picker was ignored: AU/Victoria 2026 did not show Mon 2 Nov as a bridge to Melbourne Cup. Selecting several countries merged their calendars into one. The headline also read '1 bridge-day opportunities'. Each selected country is checked against its own calendar, including its region. AU/VIC 2026 now shows 2 opportunities, including Mon 2 Nov → Melbourne Cup Day. US+UK 2026 shows 4 opportunities, each labelled 'US:' or 'UK:' (it was 3, merged). The headline grammar is fixed ('1 bridge-day opportunity').
Payment Terms Calculator (2/10 Net 30) The page talked about the annualised cost of the discount, but the tool never showed it. The page copy also said 'roughly 36%'. New output 'Annualised cost of not taking the discount' = d/(1−d) × 365/(net − discount days). For 2/10 Net 30 it shows 37.2%. It shows n/a when the discount window is not shorter than the net term. Copy updated to about 37%.
Hybrid Work Schedule Calculator The limits text said the tool 'does not model … a requirement to be in on specific weekdays', when counting specific in-office weekdays is exactly what it does. The limits text now says the tool counts the in-office days your chosen weekdays produce, after holidays and closures, and that it does not schedule a flexible 'N days a week' policy or model anchor days, desk booking or capacity.

Holiday data, same day

October 12, 2026: guides corrected

Every older guide was re-read against the calculator it describes, and its worked examples were re-run. Most of these were accurate when written and went stale when the calculator behind them was fixed in July or August; some were simply wrong. 84 guides were corrected, and each now shows an “Updated” date. What each one said before, and says now:

August 13, 2026: three code audits

Three audits read every calculator's arithmetic against the rule it implements, then ran each one through 1,210 boundary cases (blank fields, zero, reversed ranges, extreme years). These are the fixes that changed a date or number a visitor would see.

CalculatorWhat was wrongWhat it does now
WARN Act Layoff Notice Deadline Counted 10 business days backward from the layoff date, borrowed from the bid-deadline tool. Counts the 60 calendar days federal WARN requires (the period is editable, because some state laws require 90).
FMLA Leave Return-to-Work Added 10 business days to the leave start date. Adds the 12 workweeks of FMLA leave (26 for military caregiver leave) and rolls to the next scheduled workday.
SEC Filing Deadline Gave accelerated filers 45 days for a 10-Q and used the pre-2024 10-day deadline for Schedule 13D. Both accelerated tiers get 40 days for a 10-Q; Schedule 13D is due in 5 business days. Rule 0-3 roll-forward applies to every form.
Statute of Limitations Deadline Held verified periods for 4 states and applied a generic 2-year fallback to the other 46, so in a 1-year state such as Tennessee or Kentucky it returned a date a year after the claim had expired. Returns no date for a state it does not cover and names the states it does. The same fix went into the mechanic’s lien, security deposit and workers’ comp tools.
COBRA Election Deadline Calculator Measured the 45-day first-premium deadline from the end of the election window, not from the election. Takes the election date. Electing on day 10 now gives a first-premium deadline of day 55, not day 105.
Rotating Shift Calendar Advertised Panama, DuPont and custom rotations but had no pattern selector, so every result was 4-on-4-off. All four patterns exist and the selector renders.
T+1 / T+2 Trade Settlement Counted settlement days on the civil holiday calendar, so a T+1 trade could settle on Good Friday (NYSE closed) and not on Columbus Day (NYSE open). Uses an NYSE trading calendar and names the closures it crossed. The NZ settlement tool now uses NZX trading days.
Federal Civil Appeal Deadline (FRAP 4) Passed an empty holiday list to the roll-forward, so a FRAP 4 deadline that landed on Memorial Day stayed there. Rolls past federal holidays. The 401(k) deposit tool had the same defect and got the same fix.
Probate Timeline Calculator Started the creditor-claim and inventory clocks at the date of death. Starts them at the issuance of letters, which is now an input.
OPT / STEM OPT / Visa Grace Period Treated the 24-month STEM extension as 24 × 30 days (720 days). Adds 24 calendar months.
Discovery / Court Filing Deadline Folded the FRCP 6(d) three extra days for mail service into a business-day count. Adds the three days as calendar days, as the rule says.
Mechanic’s Lien Filing Deadline Showed California’s 20-day preliminary notice for every state. Shows the preliminary notice only where the state requires one.
Payroll Pay Period Generator Implemented semi-monthly pay as “add 15 days”, which drifted: from 1 January it paid Jan 16, Jan 31, Feb 15, then Mar 2, Mar 17 and Apr 1, about 24.3 periods a year. Pays on the 15th and the last day of the month, moved back to the previous working day when either is a weekend or holiday.
Real Estate Closing Date Read a 0-day financing contingency (a cash offer) as blank and reinstated the 21-day default. Contingencies were also counted only in business days. A 0 shows as “Waived”. Contingencies default to calendar days, with a business-day option.
Net 30 Invoice Due Date Read “Net 0” as blank and used Net 30. Net 0 is due on the invoice date. 38 inputs across the site were fixed the same way.
Divorce / Marriage Waiting Period Guessed 60 days for the 45 states outside its table. Returns no date for an uncovered state and names the six it covers.
Notice Period / Last Working Day Could report a Saturday as the last working day. Reports both the formal end of the notice period and the last day actually worked.
Freelance Invoice Scheduler Accepted any number of cycles; 9,999 produced nearly 20,000 rows and hung the browser. Inputs and loops are bounded.
Vacation Accrual Projector Ignored the start date and printed “Month 1”, “Month 2” and so on. Anchors real dates and shows the balance accrued to today.
Subscription Renewal Date Moved renewals off weekends by default, which card billing does not do. Renews on the calendar date by default; moving to a working day is an option.
Working Days Left in Year Counted today, while the countdown tool did not. Excludes today, so the two tools agree.
Holiday Bridge-Day Finder Ignored holidays that fall on a Wednesday. Shows them: two bridge days for a five-day break.
Passport Renewal Timing Calculator Did not take the passport’s expiry date, so it could not check the six-month validity rule its own guide is about. Takes the expiry date and warns when the passport is valid for the trip but short of six months.

Holiday data, same day

Every calculator reads the same holiday tables, so these affected any count that crossed the dates involved.

July 29, 2026: content-accuracy audit

Every calculator page's explanation was checked claim by claim against the code. 84 findings; where the code was wrong it was fixed, and where the text was wrong the text was.

CalculatorWhat was wrongWhat it does now
I-9 Form 3-Business-Day Deadline Every tool started at a hard-coded 10 business days, whatever its rule. The I-9 page offered 10 days instead of 3. Each tool starts at its own period: 3 business days for the I-9, 2 for Reg CC holds and NZX settlement, 5 for customs, 21 calendar days for letters of credit, 30 calendar days for an IRS levy notice.
Stock Option Post-Termination Exercise Counted the 90-day post-termination window in business days, landing about six and a half weeks after the real deadline. Counts 90 calendar days with no roll-forward, and shows the last business day to act.
NZ / AU Business Day Calculator Auckland Anniversary 2026 resolved to 2 February, and ANZAC Day 2026 (a Saturday) was not moved to Monday. Auckland Anniversary is 26 January 2026; ANZAC Day is observed on Monday 27 April 2026.
4-Day / Custom Work Week When a workweek preset and the weekday checkboxes both appeared, the checkboxes silently won and the preset did nothing. Choosing a preset sets the checkboxes.
Date Difference Analyzer The worked example on the page counted exclusively (29 days, 696 hours) while the tool counts inclusively. The example matches the tool: 30 days, 720 hours. 53 calculator pages had their text corrected to match the code in the same pass.

Other changes

New guides

Every guide published on the site, newest first. The full list with summaries is on the blog.

October 2026 (7)

August 2026 (2)

July 2026 (69)

June 2026 (40)

May 2026 (7)

Send feedback

We read every message. Tell us what could be better or what you love.